|
 |
| |
|
|
Problem: Fast and accurate changeover of mould dies for the moulding machine
Product: Tool changing system
GTE's role: Co-developer for concept, design and final product, as well as support during installation
Innovation: Fully automated changer for dies based on a manipulator and transport units
Result: Faster (from 4 to 1 hour), safer and low-maintenance way to change dies on the moulding machine
Back |
|
 |
|
|
|